Home / 15 Most visited 9
Creation date / 2014 / All

-
(25479) Installing the tile backsplash
-
(25440) The trash bins and spice rack next to oven
-
(25293) Countertops done, sink installed
-
(25231) Wall removed, floor patched
-
(25164) Lights raised because the new cabinets are a foot taller than the previous ones
-
(25011) The cabinet and drawer door pulls
-
(24923) Some of the new cabinets are installed, waiting for counter top
-
(24880) The tile backsplash
-
(24859) Cutting in the outlets, oven spacer installed