Home / 15 Most visited 7
Creation date / All / All / Tuesday
Friday »

-
(13943) Countertops done, sink installed
-
(13867) Before
-
(13807) Wall removed, floor patched
-
(13692) Lights raised because the new cabinets are a foot taller than the previous ones
-
(13617) Some of the new cabinets are installed, waiting for counter top
-
(13465) Installing the tile backsplash
-
(13418) Cabinets removed