Home / 15 Most visited 9
Post date / 2014 / All

-
(25920) The trash bins and spice rack next to oven
-
(25817) Installing the tile backsplash
-
(25697) Wall removed, floor patched
-
(25650) Lights raised because the new cabinets are a foot taller than the previous ones
-
(25638) Countertops done, sink installed
-
(25373) The cabinet and drawer door pulls
-
(25255) Some of the new cabinets are installed, waiting for counter top
-
(25231) The tile backsplash
-
(25172) Cutting in the outlets, oven spacer installed