Home / 15 Most visited 9
Post date / 2014 / All

-
(25476) Installing the tile backsplash
-
(25439) The trash bins and spice rack next to oven
-
(25292) Countertops done, sink installed
-
(25226) Wall removed, floor patched
-
(25161) Lights raised because the new cabinets are a foot taller than the previous ones
-
(25010) The cabinet and drawer door pulls
-
(24922) Some of the new cabinets are installed, waiting for counter top
-
(24879) The tile backsplash
-
(24858) Cutting in the outlets, oven spacer installed